FAIL (the browser should render some flash content, not this).

 

EDF BUGEY

  • Design and construction of a unit for mixing and pumping mortar
  • Installation of processing facilities/an airlock for processing
  • Inerting FA/MA waste stored in drums
  • Preparing the waste for ANDRA
  • Drawing up a specific agreement for FA et MA for ANDRA

EDF SAINT LAURENT NOUAN

Studies for the carrying out to:

  • Cutting up and demolition of tarpaulins and water system coated with lead paint
  • Exit checks of metal components
  • Recycling metallic waste as a registered foundry
  • Quantity treated: about 250 t of metal